Think and act in a safe manner. Always disconnect power and use a lockout before you work on the E-coat system, or any of the related subsystems. Observe any confined space conditions. Use the appropriate safety equipment and clothing for the task. Please carefully read all the instructions listed below to familiarize yourself with the project before attempting to perform any of the work.
General
The pictures show proper lifting technique of crates of 10 feet or more. Failure to follow the recommended instructions will cause damage to crate. Below Shows that two pallet jacks must be used to move the crate. Using only a forklift will cause damage to shipment.
The picture below shows proper position of one pallet jack.
Below Shows the Proper position of second pallet jack.