Side Membrane Electrode Cell Checklist
Product Support and Customer Service
For Further support visit our Contact Page
! | ? | X | Description | Comments, Exceptions, & Notes |
Does Membrane Shell hang plumb? | ||||
Is centerline of overflow nozzle 80 mm ( 3.2”) above the rim of the ED tank? –or-
________ above the rim of the ED tank? |
||||
Is compression washer flat? | ||||
Is Electrode properly seated? | ||||
Is cable lead connected to bus bar? | ||||
Are the clamps over tightened? Are clamps square to strut channel? | ||||
Is Cell Splash Guard or other drip shield installed properly? | ||||
Is Cell electrolyte supply tubing trimmed & connected to supply manifold with a square cut end? –or-
Is Cell supply tubing connected to another Low Profile Cell and both ends are cut off square? |
||||
Is Cell electrolyte return tubing cut square and pushed onto overflow nozzle? | ||||
Is Cell electrolyte return tubing cut at 45 degree angle and stuck only 25 mm (~1”) into the opening Electrolyte Return Manifold? -or-
Is Cell return tubing cut off square and pushed onto a hose barb fitting, which is part of the Return Manifold? |
||||
Are there any obstructions closer than 75 mm (~3”) to the Membrane Shell, below the liquid level? Or is Cell < 600 mm and within 100 mm of the centerline of eductor? | ||||
Is there a proper cable lead to each Cell? | ||||
If multi-zone are diodes on lower voltage zone cells? | ||||
Are Cells positioned per layout drawing? | ||||
Are the strut supports joined properly? (Weld or Butt splices) | ||||
Is the vertical supports plumb? Measure with bubble every 5’ |
Legend Description:
! - Needs Immediate attention ? - Some irregularity, probably ok X - Checked out fine