Cable Leads

Product Support and Customer Service

For Further support visit our Contact Page

Safety

Think and act in a safe manner. Always disconnect power and use a lockout before you work on the E-coat system, or any of the related subsystems. Observe any confined space conditions. Use the appropriate safety equipment and clothing for the task. Please carefully read all the instructions listed below to familiarize yourself with the project before attempting to perform any of the work.

Parts Reference

Screen Shot 2016-10-19 at 1.21.00 PM.png
Part Number Unit 30 Amp PN's 75 Amp PN's 120 Amp PN's
Inner Boot Each 535008 535011 535013
Outer Boot Each 535009 535010 535012
Red Plastic Housing* Each 250036 250035 250040
Metal Contact Each 250037 250024 250041
THHN Stranded Wire Meter 240002 240004 240011
Connector Lug Each 250014 250017 250013
Shrink Wrap 0.25 mm each 260001 260002 260002
  • -Requires (2) of each to make a connection
    • -In July 1997 UFSc upgraded the 45 amp to 75 amp by changing the cable from AWG #8 to AWG #6.

BULLETIN 992101

 

 

 

 

Related Items